UK vs Asia Supply

We offer supply solutions with manufacturing based in both the UK and Asia.

We will review each component on a drawing by drawing basis; and can discuss your requirements to offer the best solution.

Dependant on the volume, the complexity of the design, the material required and the lead in time required; we can often quote more competitive pricing from Asia.

UK Manufacture

  • QTY: Typically less than 1000 pieces
  • Lead Time: Typically 4-5 weeks

UK Services:

  • CNC Turning + Milling
  • Sheet Metal Bending
  • Laser Cutting
  • Fabrication + Assembly
  • In-house welding
CIS Building

Asia Manufacture

  • QTY: Over 1000 pieces
  • Lead Time: Typically 12-16 weeks

Asia Services:

  • Same as UK plus:
  • Forging
  • Casting
  • Injection Moulding
  • Robot Packaging Options
Asia Factory